Wednesday, July 29, 2009



The first dual flush toilet is installed in case of emergencies or contractors. The liquid only flush only uses 1.1 gallons of water.


Jim installed two light fixtures in the hallway. We are using all CFLs or LED lights in the house for energy efficiency.


Jim has primed the entire inside of the house and painted all of the celings white.


The front of the house needs some landscaping.


Brick - finally!


We had them spray approximately 2" of Icynene foam insulation in the attic to seal up any air leaks. Later we will add enough blown in insulation to give us an R-50 rating. The house was immediately much cooler!!


Drywall is taped and ready for finishing.


Does this look comfortable to you? Abby found a pretty unique place to take a nap.